OC Public Works will perform parking lot improvements at Salt Creek Beach.
WHAT:
Temporary parking lot closures.
- Work will occur in two phases:
- Phase I: North parking lot
- Phase II: South parking lot
- Construction activity will include removing and reconstructing asphalt concrete, slurry seal, and re-striping parking stalls.
- Access to sidewalks, paths and some parking areas will be temporarily unavailable or limited as portions of the lots will be under construction and/or used for staging equipment.
- Portions of the parking lot will temporarily close during each slurry seal operation.
- Signage and caution tape will be placed around the work areas.
- Traffic control measures, such as construction signage and flag personnel will be present.
- Please observe all safety signs, barriers and personnel when near the project area.
WHEN:
Anticipated Construction Duration:
April 13 - May 15, 2026
Working Days/Hours:
Monday - Friday, 7 a.m. - 5 p.m.
The construction schedule is tentative and subject to change due to weather and other factors.
CONTACT INFORMATION:
Carl Simon
714-581-1500
Renee Glosecki
949-923-3761